Project task
Plant expansion in pharmaceutical production – Following the integration of an acquired producer of biopharmaceutical products into the Group, a plant expansion is to take place in the areas of production and logistics. HPMlog was given the task of implementing optimal internal logistics processes at the existing site and integrating them into the growing/new production areas. HPMlog planned the logistics centre, the automatic high-bay warehouse with different temperature zones and optimized the adjacent areas such as incoming and outgoing goods, sample train and weighing cabins as well as production supply. A simulation of the main material flows was carried out as part of the planning. GMP/FDA regulations had to be taken into account in all areas during conception and planning (concept, basic and detail design).
Client
A global biotech company
Our services for the plant expansion pharmaceutical production
- Define and coordinate targets for plant expansion in terms of technology and deadlines
- Derive the optimal material flow concept and determine an economic degree of automation (material/information flow)
- Simulate material flow
- Develop and agree on an internal container concept
- Carry out risk analysis for the logistics subsystems
- Prepare draft and approval planning with indication of a detailed cost overview
- Connecting the conveyor systems to existing plant areas
- Tender logistics systems for the fully automated high-bay warehouse and the driver less transport system and carry out the award process
- Accompany the realization of the logistics systems